Especificaciones técnicas

Other information
P/N02K6809
For modelsThinkPad A20ThinkPad A20mThinkPad A20pThinkPad A21eThinkPad A21mThinkPad A21pThinkPad A22eThinkPad A22mThinkPad A22pThinkPad A30ThinkPad A30pThinkPad A31ThinkPad A31pThinkPad R30ThinkPad R31ThinkPad R32ThinkPad R40ThinkPad R40eThinkPad R50ThinkPad R50eThinkPad R50pThinkPad R51ThinkPad T20ThinkPad T21ThinkPad T22ThinkPad T23ThinkPad T30ThinkPad T40ThinkPad T40pThinkPad T41ThinkPad T41pThinkPad T42ThinkPad T42pThinkPad T43ThinkPad T43pThinkPad X20ThinkPad X21ThinkPad X22ThinkPad X23ThinkPad X24ThinkPad X30ThinkPad X31ThinkPad X40ThinkPad X41ThinkPad X41TabletThinkPad S30ThinkPad S31ThinkPad 130ThinkPad 1100ThinkPad 1200ThinkPad 1210ThinkPad 1230ThinkPad 1250ThinkPad 1260ThinkPad 1300ThinkPad 1310ThinkPad 1320ThinkPad 1330ThinkPad 1340ThinkPad 1370ThinkPad 1400ThinkPad 1500ThinkPad 1700ThinkPad 1720ThinkPad 1721

Descripción del producto

Similar alternatives

Our refurbishment process

Each device goes through 15 technical checks in our factory in A Coruña, under ISO 9001 and ISO 14001 standards, before being shipped to the customer.

1 Receipt

Receipt of the device and initial verification of the batch and documentation.

2 Traceability

Internal registration, labelling and serial number to ensure traceability of each unit.

3 Visual inspection

Inspection of the chassis, ports, hinges and external components to classify the cosmetic grade.

4 Professional cleaning

Internal and external cleaning adapted to the type of device, using specific products.

5 Board and connections

Check of the motherboard, internal connections and overall system operation.

6 CPU and memory

Processor and RAM tests under load, when applicable to the product.

7 Storage

Check of the SSD, M.2 or hard drive and replacement with a new unit if it does not pass the tests.

8 Graphics

Graphics card and video output tests according to the device configuration.

9 Ports and connectivity

Inspection of ports, slots, wired network and available wireless connectivity.

10 BIOS and firmware

BIOS or firmware check and update to the manufacturer’s latest stable version.

11 Operating system

Installation of an operating system with an official licence when applicable to the model.

12 Security

Application of critical security updates before being put up for sale.

13 Performance

Performance and stability tests according to the type of device and its intended use.

14 Final quality control

Final validation of the device and stability check before approving it for sale.

15 Packaging and shipping

Secure packaging and order preparation for mainland shipping in 24–48 h.