Especificaciones técnicas

Performance
ProcessorIntel Core 2 Quad Q9505 2.83 GHz.
RAM Memory8 Gb. DDR3 ECC RAM, 4 slots (0 empty )
Hard disk drive2x 300 Gb. SAS 3.5''
OS- No OS -
Expansion and connectivity
Optical driveDVD-RW
PortsSerial, 4x USB 2.0
Connectivity2x RJ-45
Dimensions and weight
Dimensions48x66x4 cm.
Weight18.00 Kg.
Other information
Form factorRack (1U)
CardsGraphic: G200, Network: Gigabit B5709C
Power supplyPower supplies
OthershR Box

Descripción del producto

Good exterior appearance. It may have slight signs of use on the casing. If you have any questions, call us or use our chat for more information or to request more details.

Similar alternatives

Dell PowerEdge R640 Rack

1.096 + VAT
Processor
2x Intel Xeon 20 core Gold 6138 2 GHz.
RAM Memory
64 Gb. DDR4 ECC RAM
Hard disk drive
2x 480 Gb. SSD 2.5'' · 6 slots (4 empty )
OS
- No OS -
View product

Our refurbishment process

Each device goes through 15 technical checks in our factory in A Coruña, under ISO 9001 and ISO 14001 standards, before being shipped to the customer.

1 Receipt

Receipt of the device and initial verification of the batch and documentation.

2 Traceability

Internal registration, labelling and serial number to ensure traceability of each unit.

3 Visual inspection

Inspection of the chassis, ports, hinges and external components to classify the cosmetic grade.

4 Professional cleaning

Internal and external cleaning adapted to the type of device, using specific products.

5 Board and connections

Check of the motherboard, internal connections and overall system operation.

6 CPU and memory

Processor and RAM tests under load, when applicable to the product.

7 Storage

Check of the SSD, M.2 or hard drive and replacement with a new unit if it does not pass the tests.

8 Graphics

Graphics card and video output tests according to the device configuration.

9 Ports and connectivity

Inspection of ports, slots, wired network and available wireless connectivity.

10 BIOS and firmware

BIOS or firmware check and update to the manufacturer’s latest stable version.

11 Operating system

Installation of an operating system with an official licence when applicable to the model.

12 Security

Application of critical security updates before being put up for sale.

13 Performance

Performance and stability tests according to the type of device and its intended use.

14 Final quality control

Final validation of the device and stability check before approving it for sale.

15 Packaging and shipping

Secure packaging and order preparation for mainland shipping in 24–48 h.